2024 Bridge Maintenance Project
The work to be performed consists, in general, of removing and clearing debris and sediment, repairing slope/footing protections, applying bridge deck treatment, installing bridge identification signs/markings, railing repairs and other minor concrete repairs at 19 bridges in various locations within the City of Citrus Heights.
Appendices
(click to expand/collapse)
Name | Size | ||
Append B_ Mitigation Monitoring Program Requirements | 193.3 KB | ||
Append C_ Fish & Wildlife Permit 1600-2018-0178 | 6.5 MB | ||
Append D_CVRWQCG Section 401 Permit | 1.3 MB | ||
Append E_Applicable Construction Details | 111.7 KB | ||
Append F_Insurance Surety Sheet | 86.9 KB | ||
Append G _ Costruction and Demolition Debris Recycling | 323.2 KB | ||
Append H _ Citrus Heights QAP | 1.3 MB |
Bid Documents
(click to expand/collapse)
Name | Size | ||
00_Bridge Maintenance - SPEC BOOK | 1.8 MB |