Citywide Crack Sealing Project 2024

The work to be performed consists, in general, of the following: Temporary traffic control and encroachment permitting, Placing crack seal on various roadways throughout the city, All other work shown in the contract documents.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum 1 - Appendix A Revised Project Street Names 76.4 KB
Addendum 1 - Appendix B Revised Crack Seal Map 9.6 MB
Addendum 1 - Cover 272.9 KB
Addendum 1 - Revised Prices of Items 67.4 KB
Addendum 2 (click to expand/collapse)
Name Size
Addendum 2 251.6 KB