The work to be performed consists, in general, of constructing/reconstructing accessible curb ramps, failed and damaged sections of existing curb, gutter and sidewalk, reconstructing and relocating drainage inlets, removal and replacement of deteriorated storm drain pipe, restoring and /or relocating traffic striping, legends and markers, and all other work as shown the contract documents.
Appendixes
(click to expand/collapse)

Name | Size | ||
APPENDIX B - STORM DRAIN SCOPE OF WORK | 10.8 MB | ||
APPENDIX C - VILLA OAK SD IMP | 385.1 KB | ||
APPENDIX D - 8338 OLIVINE DRAINAGE IMP | 16.4 MB | ||
APPENDIX E-K - REMAINDER APPEDICES | 13.1 MB |
Specifications
(click to expand/collapse)

Name | Size | ||
2025 A&D Bid Book | 5.6 MB |